In
July 2004 CAE completed the take over of Sutherland Engineers
Ltd making them the only Pump distributor in Scotland who
own and operate their own Pipework and vessel fabricator
without the need to subcontract and incur the unnecessary
cost of outside contractors.
Now based in our state of the art manufacturing facility
in Clydebank we offer clients a full project management
service & the ability to design, specify, supply &
install any kind of fluid handling system. In doing so we
have demonstrated the benefits of:
1.
Customised design to suit our clients specific requirements.
2. One point of contact for the client.
3. Reducing our clients supply chain.
4. Easy expediting.
5. Cost effective.
6. Co-ordinated project management.
Tanks
& Pressure Vessels

From
0.1 to 150m3 vessel size in a variety of material specifications
that can be open to atmosphere or pressure rated and designed
specifically to meet our clients
requirements.
Steam
& Boiler Pipework

Fully
coded and certified steam & boiler Pipework manufactured
to the most exacting standards BS , DIN , ASME.
Pump,Tank
& Filter Installations

Clyde
are one of Scotlands largest pump distributors and are the
only supplier to have their own dedicated Pipework /
fabrication division and are thus ideally placed to offer
pump / filter / Pipework installations as a turnkey project.

|
Hygienic
& CIP Pipework Systems

The
company has developed a reputation over a 25 year period
for excellence in hygienic applications where highest
standards of cleanliness are required in the food &
drink, pharmaceutical & biotech industries.
Heat
Recovery System
Designed
by our in house projects team to suit customers specific
applications.

Turnkey
Projects
Vat Installation Project
In
2005 we undertook a project whose aim was to move 2 off
120,000 litre stainless steel VATs from Kilwinning in
Ayrshire to Dalmuir Bond. This project was challenging
on a number of fronts.
1)
SIZE - These are large Vats measuring 5.5M high by 5M
diameter.
2) LOGISTICS - The Vats were de-installed from a bond
in Kilwinning and transported to the new site via low
loader transport.
3) SITE CONSTRAINTS - The Vats were offloaded at site
and moved into place. The key project objective was to
ensure that they fitted into the existing space restraints
of the new site.
4) PROJECT INSTALLATION - Once the Vats were moved into
place all the following was specified, supplied and installed
by Sutherland Engineers:
1. Pumps
2. Valves
3. Pipework
4. Filtration


|



Re-Slurry
Project
We recently completed a slurry recycle project for a distillery
in Edinburgh. Sutherland specified, supplied and installed:
1. 1off Slurry vessel.
2. 1off Slurry recycle pot.
3. 6off Durco ANSI Mk3 pumps.
4. All interconnecting pipework.
5. All process valves.
6. Stainless steel flooring.





|